The yellow colour dividing the two lanes of Mutua’s much hyped road has faded away. The road, as one user pointed out, is so old like it has been there all along.
This is the 33km road bitumen road build within a period of three months and which the Machakos governor Dr. Alfred Mutua billed as the fastest built highway in Africa. Well, it seems time was the main idea. How long will my road take to be built? Three months, that’s what I want.
Now a week into existence, the road looks dilapidated and tired despite the fact that less than 1000 vehicles have used it. It brings into focus the ‘hurry to develop’ without thinking and planning